Structural Steel Erection
The complex design, engineering and installation involved with structural steel erection requires strict levels of efficiency, quality and safety for each project. Providing engineering and constructability reviews, GEM Inc.’s team maintains the highest standards for structural steel design, fabrication and erection for both commercial and industrial facilities.
Our force of skilled iron workers and supervisors take projects from concept to completion. Whether it’s planned new construction, steel maintenance or an emergency building situation, our structural steel projects range from Varco Pruden pre-engineered buildings to conventional buildings including frame, deck and sheet installation.
Experience
With substantial proven experience, RLG has completed projects spanning a variety of provided services and solutions.
-
Ardagh Metal Packaging relies on Rudolph Libbe Group for 4.5 billion can production goal
Ardagh is one of the world’s largest producers of aluminum beverage cans
-
Charter Steel Cut-to-Length Bar Mill
Construction took place in an operating mill during a record-breaking sales and production period
-
Defiance City Schools institutional construction management
231,000-square-foot 6th through 12th grade school campus becomes home to more than 1,300 students
-
Turn-key Arconic waste water treatment plant delivered on-time, under-budget
Arconic turns to RLG Cleveland to deliver construction and consulting services from start to finish
-
Multi-trade coordination supports Chemtrade turnaround
GEM Inc. replaces aging precipitator with a pair of new, electrostatic units
-
ProMedica Downtown Toledo headquarters and parking structure
ProMedica builds and renovates along the Toledo Riverfront to accommodate over 1,000 employees
-
Buck & Knobby Equipment Co.
Equipment dealership's new 6,000-square-foot facility in Holland, Ohio
-
Mercy Health Oncology Diagnostic Center
Mercy Health partnered once again with RLG, this time to build a new oncology diagnostic and treatment center
-
Midwest Tape Headquarters and Warehouse Design/Build
135,000 square foot facility provides room to grow
-
Jones-Hamilton Richburg SC Chemical Manufacturing Facility
New plant increases capacity and distribution footprint in the southern United States
-
PRO-TEC Continuous Annealing Line Facility Design/Build
Two-year build performs perfectly on startup day
-
Davis-Besse Steam Generator Replacement
A one-time project with a decade of planning