Energy Solutions
GEM Energy has helped more than 250 customers save an average of 15 to 20 percent on their annual energy costs.
Our expertise comes from a deep portfolio of solutions, services and technologies, including:
- Solar
- Utility procurement
- Lighting and mechanical system upgrades
- Design/build capabilities to lead energy productivity projects from construction to commissioning
In addition, preventive HVAC and facility management services can be integrated with other GEM Energy services and technologies to reduce your business or organization’s total cost of operations.
Cost and energy savings do not have to equate with large capital investments — they can come from better operation of building systems.
Need help financing an energy project?
Our team is experienced at finding the right incentives and funding while managing all of the paperwork, including Property Assessed Clean Energy (PACE) financing. With PACE, It’s a win/win. You get energy savings and funding to the bottom line for the things that matter most to your business — which benefits everyone your facility services.
GEM Energy replaced our 30-year-old HVAC equipment and installed building controls that improve our members’ comfort and reduce our utility costs. In addition, GEM Energy has provided maintenance services to the Toledo Club for years, so they understood our unique needs for this key renovation project.
Roger Parker, General Manager, Toledo Club
Experience
With substantial proven experience, RLG has completed projects spanning a variety of provided services and solutions.
-
YMCA future-proofs facilities to better serve members
Energy improvement projects increase efficiency while reducing risk and operating costs
-
New York industrial research and development center supplements grid with CHP
GEM Energy installed the Capstone 1000 kW CHP system to meet the facility’s electrical and hot water heating needs
-
Ohio Northern University (ONU) Solar
3 MW field solar array on 12 acres of land owned by ONU
-
Toledo Club Building Energy Upgrade
A 100-year-old icon receives HVAC and lighting improvements
-
Toledo School for the Arts Renovation and Energy Upgrade
A 100-year-old building made more efficient and productive
-
Ford Field Stadium Plumbing Upgrade
Projects increased energy efficiency by 32.3 percent
-
Oakland University Combined Heat and Power Plant
Dual 200 kW microturbine-powered system
-
Twinsburg Wastewater Treatment Plant Combined Heat and Power Addition
Digester byproduct now produces 65kW of electricity
-
Toledo Zoo Solar Array Design/Build
2 MW ground array provides 30% of electricity needs